+86 18758866446robin@xcgparts.com
Hangzhou XC Machinery Co,.ltd.
  • Home
  • About us
  • Products
    • Hydraulic main pump
      • Hydraulic pump assembly
      • Hydraulic pump spare parts
      • Gear pump
      • Pilot pump
    • Engine parts
      • Liner Kit(Piston,Piston ring,Liner)
      • Main connect rod bearing
      • Water pump
      • Alternator
      • Starter
      • Turbocharge
      • Injector
      • Fan Motor
      • Tensioner
      • Cylinder Head
      • Cylinder block
      • Gasket kit
      • Oil Cooler Core
      • Engine Assembly
      • Crankshaft
    • Electric Parts
      • Controller
      • Monitor
      • Wire harness
      • AC panel
      • Throttle motor
      • Throttle Cable
      • Solenoid Valve
      • Relay
      • Pressure sensor
      • Wiper motor
      • Thermostat
      • Relief Valve
      • Lighting lamp
    • Final Drive swing motor
      • Final drive
      • swing motor
    • Travel Gearbox
      • Gearbox assy
      • Gearbox spare parts
    • Seal kit
      • Arm hydraulic cylinder seal kit
      • Boom hydraulic cylinder seal kit
      • Bucket hydraulic cylinder seal kit
      • Hydraulic pump seal kit
      • Swing motor seal kit
      • Travel motor seal kit
      • Main Control valve seal kit
      • Centre joint seal kit
    • Rock hydraulic breaker hammer
      • Silent Breaker hammer
      • Side type breaker hammer
      • Box type Breaker hammer
    • Rock bucket
    • Undercarriage parts
      • Track link
      • Track roller
      • upper roller
      • Idler
      • Sprocket
      • Adjustor assy
      • Track pad shoe
      • Rubber track
    • Swing reducer
    • Air conditioning system
      • Air condition compressor
      • Blower
      • Evaporator
    • Diagnostic Scanner Tool
    • Swing bearing
  • News
    • Company news
    • Industry-news
  • F.A.Q
  • Contact us
  1. Home
  2. News

Fight against heaven and earth! More than 20 Jingong New Energy electric loaders have bravely entered the Northwest chemical plant!

In the vast land of northwest China, various resources are abundant and diverse. Countless industrial and mining enterprises have taken root and grown in this desert, Gobi and oasis.

In response to the national "dual carbon" policy, a large chemical plant in Xinjiang has taken the lead in embarking on a green transformation path. Inside the factory area, over 20 Jingong New Energy electric loaders are neatly lined up, forming a powerful green army!

From the classic 5-ton electric loader JGM857E to the heavy-duty 7-ton electric loader JGM870E, Jingong New Energy electric loaders are reliable and durable, and have a good reputation in the market. They have become the top choice for this customer。

High performance is more reliable.


At high-intensity construction sites, the machine is basically shut down without interruption, and the performance and availability of electric loaders are required to be extremely high.
The Jingong New Energy electric loader, with its powerful performance and reliability, efficiently completes the loading and unloading tasks. Whether it is loading, unloading, stacking, or cleaning up debris and feeding materials, it can handle them all with ease.

More durable and more cost-effective


Our equipment works for more than 18 hours every day. Fortunately, the Jin Gong New energy forklift is powerful, moves quickly, is sturdy and durable, and saves much less than traditional fuel loaders! True knowledge comes from practice. The customer is very satisfied with the usage effect of the Jingong New Energy electric loader.


After calculation, compared with fuel-powered loaders, the JGM857E electric loader can reduce carbon emissions by up to 240 tons annually and increase income by as much as 561,000 yuan


More economical and more environmentally friendly

On this land, Jingong New Energy electric loaders bravely venture into the northwest, unafraid of wind, sand, rain, snow and scorching heat. With reliable and energy-saving practical performance, they help customers achieve a double harvest of economy and environmental protection, and open a new chapter of harmonious coexistence between industry and ecology!

△ Jingong New Energy Electric loaders bravely venture into the northwest

Related News

The Complete Technical Guide to Excavator Spare Parts: Maximizing Performance and Uptime

The Complete Technical Guide to Excavator Spare Parts: Maxim

Salute to 2022, adhere to the right path while seeking novelty, embrace changes, and forge ahead, the armored warriors!

Salute to 2022, adhere to the right path while seeking novel

In September, the second-hand excavator transactions: the transaction volume decreased by 1.5% month-on-month and 39.8% year-on-year; Sany's 75, 215 and 135 excavators were the most popular; the UEPI

In September, the second-hand excavator transactions: the tr

In September, the second-hand excavator transactions: the transaction volume decreased by 1.5% month-on-month and 39.8% year-on-year; Sany's 75, 215 and 135 excavators were the most popular; the UEPI

In September, the second-hand excavator transactions: the tr

In September, the operating hours of small excavators produced by Komatsu in China were 101 hours; in Indonesia, the figure reached an astonishing 208.9 hours, setting a new record.

In September, the operating hours of small excavators produc

Salute to 2022, adhere to the right path while seeking novelty, embrace changes, and forge ahead, the armored warriors!

Salute to 2022, adhere to the right path while seeking novel

Product Categories

  • Hydraulic main pump
    • Hydraulic pump assembly
    • Hydraulic pump spare parts
    • Gear pump
    • Pilot pump
  • Engine parts
    • Liner Kit(Piston,Piston ring,Liner)
    • Main connect rod bearing
    • Water pump
    • Alternator
    • Starter
    • Turbocharge
    • Injector
    • Fan Motor
    • Tensioner
    • Cylinder Head
    • Cylinder block
    • Gasket kit
    • Oil Cooler Core
    • Engine Assembly
    • Crankshaft
  • Electric Parts
    • Controller
    • Monitor
    • Wire harness
    • AC panel
    • Throttle motor
    • Throttle Cable
    • Solenoid Valve
    • Relay
    • Pressure sensor
    • Wiper motor
    • Thermostat
    • Relief Valve
    • Lighting lamp
  • Final Drive swing motor
    • Final drive
    • swing motor
  • Travel Gearbox
    • Gearbox assy
    • Gearbox spare parts
  • Seal kit
    • Arm hydraulic cylinder seal kit
    • Boom hydraulic cylinder seal kit
    • Bucket hydraulic cylinder seal kit
    • Hydraulic pump seal kit
    • Swing motor seal kit
    • Travel motor seal kit
    • Main Control valve seal kit
    • Centre joint seal kit
  • Rock hydraulic breaker hammer
    • Silent Breaker hammer
    • Side type breaker hammer
    • Box type Breaker hammer
  • Rock bucket
  • Undercarriage parts
    • Track link
    • Track roller
    • upper roller
    • Idler
    • Sprocket
    • Adjustor assy
    • Track pad shoe
    • Rubber track
  • Swing reducer
  • Air conditioning system
    • Air condition compressor
    • Blower
    • Evaporator
  • Diagnostic Scanner Tool
  • Swing bearing

Links

Google.comBaidu.com

Latest Post

  • The Complete Technical Guide to Excavator Spare Parts: Maximizing Performance and Uptime
    The Complete Technical Guide to Excavato
    2025-12-22
  • Salute to 2022, adhere to the right path while seeking novelty, embrace changes, and forge ahead, the armored warriors!
    Salute to 2022, adhere to the right path
    2025-09-13
  • In September, the second-hand excavator transactions: the transaction volume decreased by 1.5% month-on-month and 39.8% year-on-year; Sany's 75, 215 and 135 excavators were the most popular; the UEPI
    In September, the second-hand excavator
    2025-09-16

Get a Quote

Contact Us

  • +86 18758866446
  • +86 18758866446
  • robin@xcgparts.com
  • Juye Road,BinJiang District,HangZhou City,Zhejiang Province,China

WhatsApp

Scan the QR code to chat with us on WhatsApp for faster support.

WhatsApp QR code

Copyright © {year} XinCheng Machinery Co., Ltd. All rights reserved.

  • +86 18758866446
  • robin@xcgparts.com
  • +86 18758866446Scan to chat on WhatsApp
  • WeChat QR CodeScan to chat on WeChat
  • Inquiry
  • Back to Top

Online Inquiry

Get a quote within 12 hours

Tell us what you need — we'll reply as soon as possible.

WhatsApp
Phone
E-mail
Inquiry