+86 18758866446robin@xcgparts.com
Hangzhou XC Machinery Co,.ltd.
  • Home
  • About us
  • Products
    • Hydraulic main pump
      • Hydraulic pump assembly
      • Hydraulic pump spare parts
      • Gear pump
      • Pilot pump
    • Engine parts
      • Liner Kit(Piston,Piston ring,Liner)
      • Main connect rod bearing
      • Water pump
      • Alternator
      • Starter
      • Turbocharge
      • Injector
      • Fan Motor
      • Tensioner
      • Cylinder Head
      • Cylinder block
      • Gasket kit
      • Oil Cooler Core
      • Engine Assembly
      • Crankshaft
    • Electric Parts
      • Controller
      • Monitor
      • Wire harness
      • AC panel
      • Throttle motor
      • Throttle Cable
      • Solenoid Valve
      • Relay
      • Pressure sensor
      • Wiper motor
      • Thermostat
      • Relief Valve
      • Lighting lamp
    • Final Drive swing motor
      • Final drive
      • swing motor
    • Travel Gearbox
      • Gearbox assy
      • Gearbox spare parts
    • Seal kit
      • Arm hydraulic cylinder seal kit
      • Boom hydraulic cylinder seal kit
      • Bucket hydraulic cylinder seal kit
      • Hydraulic pump seal kit
      • Swing motor seal kit
      • Travel motor seal kit
      • Main Control valve seal kit
      • Centre joint seal kit
    • Rock hydraulic breaker hammer
      • Silent Breaker hammer
      • Side type breaker hammer
      • Box type Breaker hammer
    • Rock bucket
    • Undercarriage parts
      • Track link
      • Track roller
      • upper roller
      • Idler
      • Sprocket
      • Adjustor assy
      • Track pad shoe
      • Rubber track
    • Swing reducer
    • Air conditioning system
      • Air condition compressor
      • Blower
      • Evaporator
    • Diagnostic Scanner Tool
    • Swing bearing
  • News
    • Company news
    • Industry-news
  • F.A.Q
  • Contact us
  1. Home
  2. News

The selection of a new batch of national green mines began

Notice of the General Office of the Ministry of Natural Resources on the selection of a new batch of national green mines
Natural Resources Office issued [2025] 8
Departments in charge of natural resources of provinces, autonomous regions and municipalities directly under the Central Government, Bureau of Natural Resources of Xinjiang Production and Construction Corps:
In order to implement the "Ministry of Natural Resources, Ministry of Ecology and Environment, Ministry of Finance, State Administration for Market Supervision and Administration, State Financial Supervision and Administration, China Securities Regulatory Commission, State Forestry and Grassland Administration on Further Strengthening the Construction of Green Mines" (Natural Resources Regulation (2024) No. 1) and accelerate the green and low-carbon transformation of the mining industry, To comprehensively promote the construction of green mines, the Ministry decided to carry out the selection of a new batch of national-level green mines. The details of the notice are as follows:
1. Basic requirements for selection and recommendation
(1) Recommended scope. In the provincial green mine, it achieves scientific mining methods, efficient resource utilization, ecological mining environment, standardized enterprise management, and harmonious mining community, meeting the requirements of "national green mine construction evaluation index", and is an independent mining enterprise with outstanding performance.
(2) Recommended quantity. The provincial natural resources authorities shall select and recommend no more than 25 non-oil and gas mines and no more than 10 oil and gas mines on the basis of no more than half of the total number of provincial green mines in the province.
2. Selection and recommendation procedures
(1) Fill in the application online. Each provincial natural resources department shall organize the mining enterprises to be recommended to log in to the National Green Mine List Management Information System (hereinafter referred to as the directory system), upload the self-assessment report and image data, and fill in the relevant information. The national green mine selection and recommendation work will no longer be repeated arrangements for third-party evaluation, and provincial natural resources authorities can upload materials such as the original provincial green mine third-party evaluation report of the proposed mine through the directory system.
(2) Verification and confirmation. The provincial natural resources authorities organize experts in relevant fields to carry out field verification of all proposed mines (except provincial green mines that have been evaluated and stored in accordance with the evaluation indicators specified in the Natural Resources Regulation (2024) 1 document), and fill in the scoring table of the national green mine construction evaluation indicators to be recommended (see Annex 3 of the natural Resources Regulation (2024) 1 document). Clear conclusions, after the publicity of no objections, the qualified mines will be recommended to the Ministry of Natural Resources through the directory system.
The Ministry of Natural Resources will, together with relevant departments, organize experts to carry out technical review and demonstration of the recommended materials, carry out on-site verification of the recommended mines in various places according to a certain proportion, and carry out key verification of the mines with doubts or substandard construction conditions, and the verification will be notified in an appropriate manner. After the demonstration is passed, the list of recommended mines will be publicized on the portal website of the Ministry of Natural Resources, and if there is no objection during the publicity period, the list of national green mines will be announced.

Related News

The Complete Technical Guide to Excavator Spare Parts: Maximizing Performance and Uptime

The Complete Technical Guide to Excavator Spare Parts: Maxim

Salute to 2022, adhere to the right path while seeking novelty, embrace changes, and forge ahead, the armored warriors!

Salute to 2022, adhere to the right path while seeking novel

In September, the second-hand excavator transactions: the transaction volume decreased by 1.5% month-on-month and 39.8% year-on-year; Sany's 75, 215 and 135 excavators were the most popular; the UEPI

In September, the second-hand excavator transactions: the tr

In September, the second-hand excavator transactions: the transaction volume decreased by 1.5% month-on-month and 39.8% year-on-year; Sany's 75, 215 and 135 excavators were the most popular; the UEPI

In September, the second-hand excavator transactions: the tr

In September, the operating hours of small excavators produced by Komatsu in China were 101 hours; in Indonesia, the figure reached an astonishing 208.9 hours, setting a new record.

In September, the operating hours of small excavators produc

Salute to 2022, adhere to the right path while seeking novelty, embrace changes, and forge ahead, the armored warriors!

Salute to 2022, adhere to the right path while seeking novel

Product Categories

  • Hydraulic main pump
    • Hydraulic pump assembly
    • Hydraulic pump spare parts
    • Gear pump
    • Pilot pump
  • Engine parts
    • Liner Kit(Piston,Piston ring,Liner)
    • Main connect rod bearing
    • Water pump
    • Alternator
    • Starter
    • Turbocharge
    • Injector
    • Fan Motor
    • Tensioner
    • Cylinder Head
    • Cylinder block
    • Gasket kit
    • Oil Cooler Core
    • Engine Assembly
    • Crankshaft
  • Electric Parts
    • Controller
    • Monitor
    • Wire harness
    • AC panel
    • Throttle motor
    • Throttle Cable
    • Solenoid Valve
    • Relay
    • Pressure sensor
    • Wiper motor
    • Thermostat
    • Relief Valve
    • Lighting lamp
  • Final Drive swing motor
    • Final drive
    • swing motor
  • Travel Gearbox
    • Gearbox assy
    • Gearbox spare parts
  • Seal kit
    • Arm hydraulic cylinder seal kit
    • Boom hydraulic cylinder seal kit
    • Bucket hydraulic cylinder seal kit
    • Hydraulic pump seal kit
    • Swing motor seal kit
    • Travel motor seal kit
    • Main Control valve seal kit
    • Centre joint seal kit
  • Rock hydraulic breaker hammer
    • Silent Breaker hammer
    • Side type breaker hammer
    • Box type Breaker hammer
  • Rock bucket
  • Undercarriage parts
    • Track link
    • Track roller
    • upper roller
    • Idler
    • Sprocket
    • Adjustor assy
    • Track pad shoe
    • Rubber track
  • Swing reducer
  • Air conditioning system
    • Air condition compressor
    • Blower
    • Evaporator
  • Diagnostic Scanner Tool
  • Swing bearing

Links

Google.comBaidu.com

Latest Post

  • The Complete Technical Guide to Excavator Spare Parts: Maximizing Performance and Uptime
    The Complete Technical Guide to Excavato
    2025-12-22
  • Salute to 2022, adhere to the right path while seeking novelty, embrace changes, and forge ahead, the armored warriors!
    Salute to 2022, adhere to the right path
    2025-09-13
  • In September, the second-hand excavator transactions: the transaction volume decreased by 1.5% month-on-month and 39.8% year-on-year; Sany's 75, 215 and 135 excavators were the most popular; the UEPI
    In September, the second-hand excavator
    2025-09-16

Get a Quote

Contact Us

  • +86 18758866446
  • +86 18758866446
  • robin@xcgparts.com
  • Juye Road,BinJiang District,HangZhou City,Zhejiang Province,China

WhatsApp

Scan the QR code to chat with us on WhatsApp for faster support.

WhatsApp QR code

Copyright © {year} XinCheng Machinery Co., Ltd. All rights reserved.

  • +86 18758866446
  • robin@xcgparts.com
  • +86 18758866446Scan to chat on WhatsApp
  • WeChat QR CodeScan to chat on WeChat
  • Inquiry
  • Back to Top

Online Inquiry

Get a quote within 12 hours

Tell us what you need — we'll reply as soon as possible.

WhatsApp
Phone
E-mail
Inquiry