Mobile: +86 18758866446  E-mail: robin@xcgparts.com
XC Machinery Co,.ltd.
  • Home
  • About us
  • Products
    • Hydraulic main pump
      • Hydraulic pump assembly
      • Hydraulic pump spare parts
      • Gear pump
      • Pilot pump
    • Engine parts
      • Liner Kit(Piston,Piston ring,Liner)
      • Main connect rod bearing
      • Water pump
      • Alternator
      • Starter
      • Turbocharge
      • Injector
      • Fan Motor
      • Tensioner
      • Cylinder Head
      • Cylinder block
      • Gasket kit
      • Oil Cooler Core
      • Engine Assembly
    • Electric Parts
      • Controller
      • Monitor
      • Wire harness
      • AC panel
      • Throttle motor
      • Throttle line
      • Solenoid Valve
      • Relay
      • Pressure sensor
      • Wiper motor
      • Thermostat
      • Relief Valve
      • Lighting lamp
    • Final Drive swing motor
      • Final drive
      • swing motor
    • Travel Gearbox
      • Gearbox assy
      • Gearbox spare parts
    • Seal kit
      • Arm hydraulic cylinder seal kit
      • Boom hydraulic cylinder seal kit
      • Bucket hydraulic cylinder seal kit
      • Hydraulic pump seal kit
      • Swing motor seal kit
      • Travel motor seal kit
      • Main Control valve seal kit
      • Centre joint seal kit
    • Rock hydraulic breaker hammer
      • Silent Breaker hammer
      • Side type breaker hammer
      • Box type Breaker hammer
    • Rock bucket
    • Swing reducer
    • Undercarriage parts
      • Track link
      • Track roller
      • upper roller
      • Idler
      • Sprocket
      • Adjustor assy
      • Track pad shoe
      • Rubber track
    • Air conditioning system
      • Air condition compressor
      • Blower
      • Evaporator
    • Diagnostic Scanner Tool
    • Swing bearing
  • News
    • Company news
    • Industry-news
  • F.A.Q
  • Inquiry
  • Contact us

News

  1. Home
  2. News
  3. The Most Amazing "Move"! 30,000 Ton Trai...

The Most Amazing "Move"! 30,000 Ton Train Station Makes a 90-Degree Turnaround. Netizens: The Infrastructure Construction Experts Have Not Deceived Me.

On July 10th, the CCTV documentary "Great Nation Construction" (its sixth episode titled "Innovative Ingenuity") featured this story. 

During the construction of the Fuzhou-Xiamen high-speed railway, it happened to be blocked by the Xiamen Houxixi Long-distance Bus Station (hereinafter referred to as the "bus station"). 

After a brainstorming session, the construction team decided to "relocate" the station - moving it to an open area in the northwest direction. 

The technique of horizontal movement is not new. In the past, we have seen some buildings undergo horizontal movement due to planning requirements. Generally speaking, horizontal movement involves cutting the building from its original foundation and moving it using traction equipment to a new fixed foundation. The process begins with the horizontal movement. However, this "traditional" horizontal movement method is not feasible for a passenger station. 

The main building of Houxixi Passenger Station is 162 meters long and 33.6 meters wide, with a total weight of 30,000 tons. It is a large, elongated structure. If it is moved horizontally from one floor, it is prone to tilt due to unstable forces.

The engineer then excavated a large foundation pit within the horizontal movement range and laid 26 curved concrete tracks... Thus, the preparatory work was just completed. 

During the mobile stage, the engineers ingeniously drew on the top-pressing principle used in road and bridge construction. They created a hydraulic device and arranged them in groups of four, with each pair alternating in ascending and descending movements for top-pressing. It was like installing walking feet on a passenger station. To monitor the "walking" information in real time, the engineers also installed 500 walking mechanisms and 600 sensors on the "soles" of the top-pressing devices...
It is reported that a representative from China Construction First Group Corporation Limited stated that this relocation project mainly involved a number of highly challenging technologies, including: cutting and separating the two underground floors of the building, how to maintain the posture of the relocated object during the curved displacement; how the relocation equipment can ensure synchronous coordination on the curve; how to monitor the structure of the relocated object in real time to ensure the safety of the relocation; and how to promptly correct deviations during the relocation process. 

Facing multiple difficulties and challenges, after 38 days, the main station building of the 30,000-ton long-distance passenger station was successfully moved: on average, it moved about 7.5 meters per day, from 9 o'clock to 12 o'clock, covering a total distance of 288 meters. 

After the movement was completed, the engineers connected and reinforced the cut-off columns and the reserved foundation at the new site with steel bars and concrete to ensure safe use in the future. 

The relocation project began in May 2018 and was successfully completed on April 1, 2019. At that time, this relocation project was certified by the Guinness World Records as the "longest arc of building relocation distance" with a displacement of 288.24 meters. This was also the world's first long-distance and large-radius building relocation. 

Netizen: It seems that the record of the "Infrastructure Construction Wizard" can only be broken by ourselves!

Related News

Smart Global! Otte Technology unveils bauma 2025 with Lubmann

Smart Global! Otte Technology unveils bauma 2025 with Lubman

Global construction machinery is expected to experience explosive growth in 2023.

Global construction machinery is expected to experience expl

Half a century of hardcore protection, a dreamy collaboration between China Railway Construction Corporation and the Mogao Caves

Half a century of hardcore protection, a dreamy collaboratio

Man brand filter Flexline flexible shape air filter Customized requirements

Man brand filter Flexline flexible shape air filter Customiz

Chevron and Caterpillar announced a hydrogen energy cooperation agreement and showcased their hydrogen-powered locomotives for the first time.

Chevron and Caterpillar announced a hydrogen energy cooperat

In response to the shortage of Nissan engine supplies, JFE Steel USA has temporarily switched to Yanmar and Isuzu engines.

In response to the shortage of Nissan engine supplies, JFE S

Product Categories

  • Hydraulic main pump
    • Hydraulic pump assembly
    • Hydraulic pump spare parts
    • Gear pump
    • Pilot pump
  • Engine parts
    • Liner Kit(Piston,Piston ring,Liner)
    • Main connect rod bearing
    • Water pump
    • Alternator
    • Starter
    • Turbocharge
    • Injector
    • Fan Motor
    • Tensioner
    • Cylinder Head
    • Cylinder block
    • Gasket kit
    • Oil Cooler Core
    • Engine Assembly
  • Electric Parts
    • Controller
    • Monitor
    • Wire harness
    • AC panel
    • Throttle motor
    • Throttle line
    • Solenoid Valve
    • Relay
    • Pressure sensor
    • Wiper motor
    • Thermostat
    • Relief Valve
    • Lighting lamp
  • Final Drive swing motor
    • Final drive
    • swing motor
  • Travel Gearbox
    • Gearbox assy
    • Gearbox spare parts
  • Seal kit
    • Arm hydraulic cylinder seal kit
    • Boom hydraulic cylinder seal kit
    • Bucket hydraulic cylinder seal kit
    • Hydraulic pump seal kit
    • Swing motor seal kit
    • Travel motor seal kit
    • Main Control valve seal kit
    • Centre joint seal kit
  • Rock hydraulic breaker hammer
    • Silent Breaker hammer
    • Side type breaker hammer
    • Box type Breaker hammer
  • Rock bucket
  • Undercarriage parts
    • Track link
    • Track roller
    • upper roller
    • Idler
    • Sprocket
    • Adjustor assy
    • Track pad shoe
    • Rubber track
  • Swing reducer
  • Air conditioning system
    • Air condition compressor
    • Blower
    • Evaporator
  • Diagnostic Scanner Tool
  • Swing bearing

Links

Google.comBaidu.com

LatestPost

  • The End of an Era: Carter Mining Closes Its German Factory
    The End of an Era: Carter Mining Closes
    2025-08-18
  • Cold fact: How did excavators move before the central rotary joint was invented?
    Cold fact: How did excavators move befor
    2025-08-16
  • The larger, the lonelier. I felt a sense of this when I saw those imagined giant machines.
    The larger, the lonelier. I felt a sense
    2025-08-15

Feedback

Contact Us

465659878

+86 18758866446

+86 18758866446

robin@xcgparts.com

robinwanguuu@hotmail.com

560 YueMing Road,BinJiang District,HangZhou City,Zhejiang Province,China

MOBILE WEBSITE

Copyright © XinCheng Machinery Co,.ltd. All Rights Reserved.

  • Skype.
  • E-mail
  • Whatsapp
  • Inquiry